BRISBANE MOVE PROJECT – Brisbane City Council
Client Background
BRISBANE MOVE PROJECT – Brisbane City Council
Project Requirement
Supply a 35,000L water settlement tank.
Solution Provided
A PSL-35 water clarification tank with engineer designed pipework structure and fittings was designed and supplied to fit the scope of works. Due to the tank being oversize and the project location in Brisbane C.B.D a midnight delivery with pilot vehicle escort was facilitated.
Scope of Work
• Product Design
• Engineering
• Product Manufacture
• Delivery